Studio 4A

WSOA // Fall 2019 // Instructor: Linda Talman // Partner: Hosam Fatani

 

This studio placed an emphasis on design, structure, and systems. It focused on designing a fire station that is efficient as well as structurally sufficient. Majority of the focus was to accurately design and place systems where need be.

 

Phase 1: case study fire stations

 
Analysis_82919_compressed-page-001.jpg
 

Phase 2: pROPOSAL DIAGRAMS & SYSTEM INTEGRATIONS

Phase 3: pLANS AND sECTIONS